Home
Download PDF
Order CD-ROM
Order in Print
Home
>
UFGS Criteria Document Report
>
> 15501N
SECTION 15501N STEAM HEATING PLANT WATERTUBE (SHOP ASSEMBLED) COAL/OIL OR COAL
SECTION 15501N STEAM HEATING PLANT WATERTUBE (SHOP ASSEMBLED) COAL/OIL OR COAL (Cont.)
REFERENCES - 15501N0013
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) - 15501N0014
ASTM INTERNATIONAL (ASTM) - 15501N0015
FM GLOBAL (FM) - 15501N0016
NATIONAL BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS (NBBPVI) - 15501N0017
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA) - 15501N0018
DEFINITIONS - 15501N0019
Economizer - 15501N0020
Forced Draft Fan (Coal Firing)
Fuel Oil Pump
Fuel Oil Pump (COnt.)
[Fuel Oil Pump and Heater Set
Ash Handling System (Pneumatic) - 15501N0025
Ash Handling System (Mechanical) - 15501N0026
Deaerating Heater - 15501N0027
Water Softening System - 15501N0028
Detail Drawings - 15501N0029
Boiler Room Auxiliary Equipment
Stokers - 15501N0031
Burners - 15501N0032
Piping and Specialty Items
Posted Operating Instructions - 15501N0034
Economizer - 15501N0035
SD-02 Shop Drawings - 15501N0036
SD-03 Product Data - 15501N0037
QUALITY ASSURANCE - 15501N0038
Certification of Backflow Preventer - 15501N0039
Proof of Experience - 15501N0040
Manufacturer's Installation Approval
Burner Emission Requirements
Packaged Watertube Boiler
Water Column
Wrenches
Retractable Sootblowers
ECONOMIZER - 15501N0047
Insulation - 15501N0048
Stoker Grate Area and Heat Release Rate
Stoker Drive
Lubrication - 15501N0051
Electric Ignition System
Aspirating System
Control Sequencing
Circuit Analyzer
Noise Level for Forced Draft Fan
Painting - 15501N0057
Air Filter - 15501N0058
Aftercooler - 15501N0059
Refrigerated Air Dryer - 15501N0060
BREECHING, EXPANSION JOINTS, STACKS, DAMPERS, AND ACCESSORIES
Breeching Structural Materials - 15501N0062
Manufacturer's Calculations Required
Finish - 15501N0064
Dampers - 15501N0065
Guillotine Dampers - 15501N0066
COAL HANDLING EQUIPMENT - 15501N0067
Pit-Type Railroad Hopper Car Thawing System
Surface Mounted Enclosed Railroad Hopper Car Thawing System - 15501N0069
Shed - 15501N0070
Shaker
Capstan Car Puller
Puller
Track Hopper - 15501N0074
Truck Hopper
Belt Feeder
Idlers - 15501N0077
Head and Foot Shafts - 15501N0078
Grating - 15501N0079
Backstop
Anchoring Brackets
Trough
Head and Foot Shafts - 15501N0083
Emergency Stop Cord and Switch
Coal Scales
Weighing Mechanism
Coal Valve - 15501N0087
Track and Reclaim Hopper Valves
Type A - Diaphragm Type Presence Indicator
Equipment Speed Response Switch
Control Panel - 15501N0091
Remote Controls
Multiple Belt Scrapers
Stackout Tube
Type
Discharge Doors or Gates
Manual Valve Intakes for Bottom Ash
Ash Conveyor Pipe and Fittings - 15501N0098
Primary Receiver-Separator
Isolation Gates - 15501N0100
Discharge Gate - 15501N0101
Control Panel - 15501N0102
Ash Storage Silo
Construction - 15501N0104
Bag Filter Vent
General - 15501N0106
Operation - 15501N0107
ASH HANDLING SYSTEM (MECHANICAL) - 15501N0108
Ash Silo - 15501N0109
Conveyors
Screw Conveyors - 15501N0111
Screw Conveyors (Cont.)
Bucket Elevator
Boot Section
Construction - 15501N0115
Pulse Jet Bag Filter Vent - 15501N0116
Control Panel and Controls
Control Panel - 15501N0118
AIR POLLUTION CONTROL EQUIPMENT - 15501N0119
Coating - 15501N0120
Heater Capacity
Connections - 15501N0122
Level Control - 15501N0123
Low Pressure Steam Control - 15501N0124
Gage Glasses - 15501N0125
Pump Service Requirements - 15501N0126
Minimum Flow Protection for Boiler Feed Water Pumps - 15501N0127
Feedwater Stop and Check Valves - 15501N0128
Construction - 15501N0129
Variable Speed Motor Control
Housing - 15501N0131
Controller Environmental Protection - 15501N0132
Sump Pumps - 15501N0133
Brine Storage System - 15501N0134
Chemical Feed Systems - 15501N0135
All Welded Blowdown Tank
Controls - 15501N0137
Sample Cooler - 15501N0138
Materials - 15501N0139
Flanges - 15501N0140
Valves - 15501N0141
Valves (Cont.) - 15501N0142
Bolts and Nuts - 15501N0143
Pipe Hangers and Supports - 15501N0144
Backflow Preventers - 15501N0145
TOOLS AND TESTING EQUIPMENT
SOURCE QUALITY CONTROL - 15501N0147
Horizontal Fuel Oil Tanks (Below Ground)
Piping - 15501N0149
Copper Tubing - 15501N0150
Cleaning of Piping - 15501N0151
Reduction in Pipe Size
Pressure Gage Installation - 15501N0153
Painting - 15501N0154
Tests and Inspections (Piping)
General Start-Up Requirements
Plant Equipment Tests - 15501N0157
Vertical Fuel Oil Tank - 15501N0158
Strength and Leak Tightness Tests - 15501N0159
General Operational Tests
Auxiliary Equipment and Accessory Tests - 15501N0161
Temporary Waste Steam Connection - 15501N0162
Manufacturers Field Services
Instruction to Government Personnel - 15501N0164
15501N