experience in calibrating tanks of comparable type and size.]
1.6.6.3
Manufacturer's Installation Approval
Submit manufacturer's installation approval for the following systems and
equipment as specified under paragraph entitled "System and Equipment
Installation":
a.
b.
Coal handling system;
c.
Ash handling system;
d.
e.
Steam turbines;
f.
Variable speed motor controller; and
g.
[_____].
1.6.6.4
Boiler Inspector's Report
Submit as specified under paragraph entitled "Boiler Inspection."
1.6.6.5
System and Equipment Installation
Submit from each system supplier and each manufacturer of the equipment,
written certification that the system and equipment installation is in
accordance with the system supplier's and equipment manufacturer's
instructions and recommendations, that the unit or system has been run,
rotating parts have been dynamically balanced, fluid (including air) flows
adjusted and have been calibrated, and the equipment or system is ready for
final testing. Certificates shall be submitted before the entire boiler
plant may be given an acceptance test.
[1.6.6.6
Submit four copies of the certified record.
]1.6.6.7
Backflow Preventer
Submit a Certificate of Full Approval or a current Certificate of Approval
for each design, size, and make of backflow preventer being provided for
the project.
1.7
ENVIRONMENTAL REQUIREMENTS
Boiler plant shall comply with all applicable Federal, State, and local
environmental regulations.
1.7.1
Air Permits
Permits for construction and operation of the boiler plant must be obtained
from and/or submitted to the local environmental regulatory agency prior to
the start of construction.