j.
Silo fluidizing system and rotary ash conditioner.
1.4.2.5
Burners
Include the following:
a.
General arrangement;
b.
Piping details;
c.
Burner control schematics;
d.
Flame safety schematics;
e.
Component details; and
f.
Throat tile details.
1.4.2.6
Stacks, Dampers, and Breechings
Include the following:
a.
General arrangement;
b.
Breeching, reinforcing details;
c.
Breeching hangers and support details;
d.
Dampers and operators;
e.
Access doors and frames;
f.
Expansion joints; and
g.
Stack details including anchor bolt and foundation details, stack
sampling ports, platforms, and accessories.
1.4.2.7
Include the following:
a.
Certified outline and general arrangement drawings for complete
coal handling system;
b.
Dimensional equipment and fabrication drawings, including
equipment weights, equipment locations, support details, and
anchor bolt arrangements for items and equipment specified under
c.
Control panel, coal presence indicators, and equipment response
switch details; and
d.
1.4.2.8
Fuel Oil Equipment
Manufacturer's standard size for pumps, pump curves, valves, strainers and
pump wiring and include the following: