b.
Vibrators: Provide on cone bottom of coal bunker a heavy duty
pulsating magnet electric vibrator, semi-noiseless type, complete
arranged for mounting in wall mounted control panel. Panel shall
contain an "ON-OFF" switch, power control dial, fuses and
rectifier. Power supply to panel shall be 460 volt, single phase,
60 Hz current.
2.9.22
Stackout Tube
Provide a stackout type discharge tube not less than 10 mm 3/8 inch thick,
reinforced, stainless steel plate for discharging coal from stackout
conveyor to coal storage yard. Tube shall be 1220 mm 4 feet in diameter,
and designed as the structural support for a portion of the stackout
conveyor and support steel as indicated. Tube shall be a window chute
designed to discharge coal at not more than 1829 meters 6 feet above coal
pile.
2.10
FUEL OIL SYSTEM
**************************************************************************
NOTE: In reference to the following text, choose
either Section 13216 UNDERGROUND PETROLEUM TANKS,
for below gound tanks, or Section 15192 FUEL OIL
PIPING, for above ground tanks. The rest of the
PIPING.
**************************************************************************
15192N FUEL OIL PIPING[.][, except for below grade level fuel tanks, which
shall be constructed to Section 13216 UNDERGROUND PETROLEUM TANKS.]
2.11
ASH HANDLING SYSTEM (PNEUMATIC)
**************************************************************************
NOTE: Designer shall select type of ash handling
system most suited for each project. For plants over
4 kg per second 31,500 pounds per hour steam
ultimate capacity use a pneumatic ash handling
system. For plants under 4 kg per second 31,500
pounds per hour steam ultimate capacity use a
mechanical system. Refer to NAVFAC DM-3.6, NAVFAC
Design Manual DM-3.6, Section 5, paragraph 4d for
design criteria.
**************************************************************************
**************************************************************************
NOTE: Choose this article (and the paragraphs and
subparagraphs following) or the article, (paragraphs
and subparagraphs) below, entitled "Ash Handling
System (Mechanical)."
**************************************************************************
2.11.1
System Requirements
Provide a complete integrated, pneumatic, semi-automatic sequencing, ash
handling system with air intakes, material intakes, [ash doors and