Equipment
Operation Instruction
Maintenance Instruction
Boiler and auxiliaries
40
hours
16
hours
Stoker
40
hours
16
hours
FD and ID fans
16
hours
16
hours
Coal handling system
16
hours
32
hours
Ash handling system
24
hours
8
hours
8
hours
16
hours
Boiler feedwater pumps
8
hours
8
hours
Miscellaneous equipment
16
hours
16
hours
3.2.8
SCHEDULE
Some metric measurements in this section are based on mathematical
conversion of inch-pound measurement, and not on metric measurement
commonly agreed to by the manufacturers or other parties. The inch-pound
and metric measurements shown are as follows:
Products
Inch-Pound
Metric
Steam Gage
12 inch diameter
300 mm diameter
Boiler
4,000-18,000 #/hr
1/2-2 1/4 kg/sec
capacity
capacity
Electric Motor
10 hp
7 1/2 kW
Thermometer
5 inch Dial
125 mm Dial
Pressure Gage
6 inch Dial
180 mm Dial
-- End of Section --
SECTION 15501N
Page 164