Home
Download PDF
Order CD-ROM
Order in Print
Home
>
UFGS Criteria Document Report
>
> 2753
SECTION 02753 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS MORE THAN 10,000 CUBIC YARDS
REFERENCES -27530006
ASTM INTERNATIONAL (ASTM) -27530007
ASTM INTERNATIONAL (ASTM) (cont.) -27530008
SYSTEM DESCRIPTION -27530009
SUBMITTALS -27530010
SD-05 Design Data -27530011
MEASUREMENT AND PAYMENT -27530012
ACCEPTABILITY OF WORK AND PAYMENT ADJUSTMENTS
Acceptance of Lots
Smoothness Requirements
Testing Method -27530016
Edge Slump and Joint Face Deformation
Excessive Edge Slump
Flexural Strength
Computed Percent Payment for Thickness
ACCEPTABILITY OF WORK -27530021
TESTING DURING CONSTRUCTION
Laboratory Accreditation
TEST SECTION -27530024
DELIVERY, STORAGE, AND HANDLING OF MATERIALS -27530025
Type and Capacity of Batching and Mixing Plant
Concrete Mixers -27530027
TABLE 1. UNIFORMITY REQUIREMENTS--STATIONARY MIXERS
Transporting Equipment -27530029
Paver-Finisher with Fixed Forms
Longitudinal Mechanical Float
Burlap Drag
CEMENTITIOUS MATERIALS -27530033
Blended Cements
Aggregate Sources
Combined Aggregate Gradation
Coarse Aggregate -27530037
Particle Shape Characteristics
Deleterious Materials - Airfield Pavements
TABLE 5. LIMITS OF DELETERIOUS MATERIALS IN COARSE AGGREGATE FOR AIRFIELD PAVEMENTS
Testing Sequence Deleterious Materials -- Airfields Only
LIMITS OF DELETERIOUS MATERIALS IN COARSE AGGREGATE FOR ROAD PAVEMENTS
CHEMICAL ADMIXTURES -27530043
MEMBRANE FORMING CURING COMPOUND
DOWELS AND TIE BARS
EPOXY RESIN
MIXTURE PROPORTIONS -27530047
Proportioning Studies
Mixture Proportioning for Flexural Strength
Contractor Quality Control for Average Flexural Strength
PREPARATION FOR PAVING
CONDITIONING OF UNDERLYING MATERIAL
WEATHER LIMITATIONS -27530053
Paving in Hot Weather
Paving in Cold Weather
Transporting and Transfer - Spreading Operations
Operation -27530057
Forms for Fixed-Form Paving
Slipform Paving
Guideline for Slipform Paving
Placing Dowels and Tie Bars
Construction Joints-Fixed Form Paving
FINISHING -27530063
Surface Correction and Testing
Texturing
Wire-Comb Texturing
CURING -27530067
JOINTS -27530068
Transverse Construction Joints
REPAIR, REMOVAL, REPLACEMENT OF NEWLY CONSTRUCTED SLABS
Removal and Replacement of Full Slabs
EXISTING CONCRETE PAVEMENT REMOVAL AND REPAIR
Edge Repair
TESTING AND INSPECTION FOR CONTRACTOR QUALITY CONTROL -27530074
TABLE 6. CONTRACTOR TESTING AND INSPECTION REQUIREMENTS
TABLE 6. CONTRACTOR TESTING AND INSPECTION REQUIREMENTS (cont.)
Reports -27530077
02753