1.4.2
Test Procedures and Reports
Test procedures shall explain in detail, step-by-step actions and expected
results, demonstrating compliance with the requirements specified. Test
reports shall be used to document results of the tests. Reports shall be
delivered to the Government within 7 days after completion of each test.
1.5
TRAINING
1.5.1
General
**************************************************************************
NOTE: The designer will coordinate the training
requirements with the installation and designate the
number of persons to be trained.
**************************************************************************
The Contractor shall conduct training courses for designated personnel in
the maintenance and operation of the system as specified. The training
shall be oriented to the specific system being installed. Training manuals
shall be delivered for each trainee with 2 additional copies delivered for
archiving at the project site. The manuals shall include an agenda,
defined objectives for each lesson, and a detailed description of the
subject matter for each lesson. The Contractor shall furnish audio-visual
equipment and other training materials and supplies. Where the Contractor
presents portions of the course by audio-visual material, copies of the
audio-visual material shall be delivered to the Government either as a part
of the printed training manuals or on the same media as that used during
the training sessions. A training day is defined as 8 hours of classroom
instruction, including 2 15-minute breaks and excluding lunchtime, Monday
through Friday, during the daytime shift in effect at the training
facility. For guidance in planning the required instruction, the
Contractor shall assume that attendees will have a high school education or
equivalent, and are familiar with ESS. Approval of the planned training
schedule shall be obtained from the Government at least 30 days prior to
the training.
1.5.2
Operator's Training I
The first course shall be taught at the project site for a period of up to
five consecutive training days at least 3 months prior to the scheduled
performance verification test. A maximum of [12] [_____] personnel shall
attend this course. Upon completion of this course, each student, using
appropriate documentation, shall be able to perform elementary operations
with guidance and describe the general hardware architecture and
functionality of the system. This course shall include:
a.
General System hardware architecture.
b.
c.
Operator commands.
d.
Data base entry.
e.
Reports generation.
f.
Alarm reporting.