in FIPS 46-3 standards, ANSI X9.52, as a minimum.
1.7
DATA TRANSMISSION SYSTEM
**************************************************************************
NOTE: Include in the project specification 1 or
more of the following UFGS for the appropriate Data
Transmission required at the project site: Section
16792A WIRE LINE DATA TRANSMISSION SYSTEM; Section
16768A FIBER OPTIC DATA TRANSMISSION SYSTEM; or
Section 16794A COAXIAL CABLE DATA TRANSMISSION
SYSTEM.
**************************************************************************
The Contractor shall provide DTS as specified in Section [_____] and as
shown.
1.8
MAINTENANCE AND SERVICE
**************************************************************************
NOTE: The maintenance and service to be provided by
the Contractor during first year's warranty period
will be included as a separate bid item, and must be
funded with O & M funds. The designer will
coordinate funding requirements with the
installation.
**************************************************************************
1.8.1
Warranty Period
The Contractor shall provide all labor, equipment, and materials required
to maintain the entire system in an operational state as specified, for a
period of one year after formal written acceptance of the system to include
scheduled and nonscheduled adjustments.
1.8.2
Description of Work
software updates, communications transmission equipment and DTS, local
processors, sensors and entry control, facility interface, and support
equipment. Responsibility shall be limited to Contractor installed
equipment. Repair, calibration, and other work shall be provided and
performed in accordance with the manufacturer's documentation and
instruction.
1.8.3
Personnel
Service personnel shall be certified in the maintenance and repair of the
specific type of equipment installed and qualified to accomplish work
promptly and satisfactorily. The Government shall be advised in writing of
the name of the designated service representative, and of any change in
personnel.
1.8.4
Schedule of Work
The Contractor shall perform two minor inspections at 6 month intervals (or
more often if required by the manufacturer), and two major inspections
offset equally between the minor inspections to effect quarterly inspection
SECTION 13720A
Page 28