Storage batteries; G
Battery charger; G
Annotate descriptive data to show the specific model, type, and
size of each item.
SD-05 Design Data
System calculations; G
Calculations substantiating battery capacity; G
SD-06 Test Reports
SD-07 Certificates
Qualifications of installer; G
Year 2000 (Y2K) Compliance Warranty
SD-10 Operation and Maintenance Data
Discharge head, Data Package 3; G
Control panel, Data Package 3; G
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
SD-11 Closeout Submittals
As-built drawings of each system; G
1.5
QUALITY ASSURANCE
1.5.1
Qualifications of Installer
Prior to installation, submit data showing that the Contractor has
successfully installed high-pressure carbon dioxide fire extinguishing
systems of the same type and design as specified herein, or that Contractor
has a firm contractual agreement with a subcontractor having such required
experience. The data shall include the names and locations of at least two
installations where the Contractor, or the subcontractor referred to above,
has installed such systems. Indicate the type and design of each system
and certify that each system has performed satisfactorily for not less than
18 months.
**************************************************************************
NOTE: For projects administered by the Pacific
Division, Naval Facilities Engineering Command,
include the following optional paragraph requiring
SECTION 13961N
Page 8