Engineer, will review and approve all submittals in this section requiring
Government approval.]
**************************************************************************
NOTE: For projects administered by the Pacific
Division, Naval Facilities Engineering Command, use
the optional "SUBMITTALS" article immediately below
and delete the general "SUBMITTALS" article above.
**************************************************************************
[ The [_____] Division, Naval Facilities Engineering Command, Fire Protection
Engineer delegates the authority to the Quality Control (QC)
Representative's U.S. Registered Fire Protection Engineer for review and
approval of submittals required by this section. Submit to the [_____]
Division, Naval Facilities Engineering Command, Fire Protection Engineer
one set of all approved submittals and drawings immediately after approval
but no more later than 15 working days prior to final inspection.]
SD-02 Shop Drawings
Piping layout; G
SD-03 Product Data
Storage cylinders; G
Discharge head; G
Discharge alarm; G
Pipe and fittings; G
Pipe hangers and supports; G
Actuating stations; G
Pressure switch; G
Control panel; G
Alarm horns; G
Alarm bells; G
[Audio] Visual alarms; G
Dampers; G
Main and reserve switch; G
Warning signs; G
SECTION 13961N