NFPA 72
(2002) National Fire Alarm Code
NFPA 75
(2003) Protection of Information
Technology Equipment
NFPA 90A
and Ventilating Systems
UNDERWRITERS LABORATORIES (UL)
UL Fire Prot Dir
(2004) Fire Protection Equipment Directory
1.2
DEFINITION
a.
Year 2000 compliant - means computer controlled facility
components that accurately process date and time data (including,
but not limited to, calculating, comparing, and sequencing) from,
into, and between the twentieth and twenty-first centuries, and
the years 1999 and 2000 and leap year calculations.
1.3
SYSTEM DESCRIPTION
**************************************************************************
NOTE: Identify the rooms, spaces, or areas, as
appropriate, which are to be protected by each type
of system. If the volume of the space under raised
floors does not exceed 56.60 cubic meters 2000 cubic
feet, total flooding system is not required.
**************************************************************************
Design and provide [new and modify existing] high-pressure carbon dioxide
[hose reel fire extinguishing systems for protection of [_____]] [and]
[underfloor total flooding fire extinguishing systems for spaces under
raised floors] for protection of [_____]. The system design and
manufacturer's products including design, materials, fabrication, assembly,
erection, examination, inspection, and testing shall be in strict
accordance with the required and advisory provisions of NFPA 12, [NFPA 70,]
[NFPA 72,] [NFPA 75,] [and] [NFPA 90A,] except as modified herein. Each
system [shall be designed for earthquakes and] shall include all materials,
accessories, and equipment inside and outside the building to provide each
system complete and ready for use. Design and provide piping layout of
each system to give full consideration to blind spaces, piping, electrical
equipment, ductwork, and other construction and equipment in accordance
with detail working drawings to be submitted for approval. Devices and
equipment for fire protection service shall be listed in UL Fire Prot Dir
systems.
1.3.1
Prepare A1 841 x 594 mm 24 by 36 inch detail working drawings of carbon
dioxide piping layout in accordance with NFPA 12 "Working Drawings
(Plans)." Show data essential for proper installation of each system.
Show details plan view, elevations, and sections of the systems supply and
piping. Show piping schematic of systems supply, devices, valves, pipe,