3.5
HTRW AIR EMISSION CONTROL
**************************************************************************
NOTE: Edit the paragraphs below so the Contractor
controls emissions to the air if action levels are
exceeded. Use air pathway analysis results to help
edit paragraphs/specify requirements. The following
paragraphs should be used when an air pathway
analysis has been conducted for HTRW remedial action.
**************************************************************************
The Contractor shall implement the following control(s) to meet or exceed
performance levels identified in HTRW PERIMETER AIR MONITORING.
3.5.1
Air Emission Control to Meet Action Levels
[_____].
3.5.2
Excavation/Production/Processing Rate Reduction
[_____].
3.5.3
Exposed Surface Area Reduction
[_____].
3.6
CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL
Disposal of wastes shall be as directed below, unless otherwise specified
in other sections and/or shown on the drawings.
3.6.1
Solid Wastes
**************************************************************************
NOTE: Select appropriate disposal alternative. In
some states certain quantities of clearing debris
may be classified as solid waste. The Designer
should include appropriate language to comply with
State requirements. Remove non-applicable bracketed
options.
**************************************************************************
Solid wastes (excluding clearing debris) shall be placed in containers
which are emptied on a regular schedule. Handling, storage, and disposal
shall be conducted to prevent contamination. Segregation measures shall be
employed so that no hazardous or toxic waste will become co-mingled with
solid waste. [The Contractor shall transport solid waste off Government
property and dispose of it in compliance with Federal, State, and local
requirements for solid waste disposal. A Subtitle D RCRA permitted
landfill shall be the minimum acceptable off-site solid waste disposal
option. The Contractor shall verify that the selected transporters and
disposal facilities have the necessary permits and licenses to operate.]
[Waste materials shall be hauled to the Government landfill site [shown on
the drawings] [designated by the Contracting Officer].] [The Contractor
shall comply with [site procedures] [Federal, State, and local laws and
regulations] pertaining to the use of landfill areas.]
SECTION 01355A
Page 20