3.3.2
Stream crossings shall allow movement of materials or equipment without
local governments. [Construction of stream crossing structures shall be in
[_____].]
3.3.3
Wetlands
**************************************************************************
NOTE: All wetlands on the site or adjacent to the
site must be identified on the drawings and this
paragraph edited accordingly. If the wetlands on
site must be disturbed, the Designer is responsible
for the coordination with the regulatory agencies
during design for identification of Section 404 of
the Clean Water Act permits whether the permit is an
Individual, Nationwide, Regional, State, or Local
404 or similar permit. All permit requirements are
to be included in the ENVIRONMENTAL PERMITS,
REVIEWS, AND APPROVALS paragraph and attached to
this specification. In addition, the Designer must
project.
If no wetlands are onsite or adjacent to the site,
delete this paragraph in its entirety. The first
sentence should normally remain intact with the
first bracketed item. This will require the
Contractor to be cognizant of the responsibility to
protect wetlands regardless of whether they are
identified on drawings or in the event site
conditions have changed since design.
**************************************************************************
The Contractor shall not enter, disturb, destroy, or allow discharge of
contaminants into any wetlands[.] [except as authorized herein. The
Contractor shall be responsible for the protection of wetlands shown on the
drawings in accordance with paragraph ENVIRONMENTAL PERMITS, REVIEWS, AND
APPROVALS. Authorization to enter specific wetlands identified shall not
relieve the Contractor from any obligation to protect other wetlands
within, adjacent to, or in the vicinity of the construction site and
3.4
AIR RESOURCES
Equipment operation, activities, or processes performed by the Contractor
shall be in accordance with all Federal and State air emission and
performance laws and standards.
3.4.1
Particulates
**************************************************************************
NOTE: This is a general performance type
requirement for particulate control. For projects
where special construction activities, such as
concrete batch plants, or extensive earthwork are
involved, the Designer should consider the need for
SECTION 01355A
Page 18