PREVENTION, RECYCLING, AND FEDERAL ACQUISTION and
DoD Instruction 4715.4 Pollution Prevention. For
Air Force projects, the Designer should see
Non-Hazardous Solid Waste Diversion Rate Measure of
Merit (MoM) dated 26 JAN 1999. For Military
Construction projects, the Designer should contact
the Using Service's Environmental Office for
additional recycling requirements.
Consider the following items to be include in the
paragraph:
(1) Generally, fallen trees should not be openly
burned or buried. Consider requiring the Contractor
to shred and use as mulch in a metropolitan area.
(If trees are to be piled in lakes or on land as
refugia for fish or wildlife, this should be shown
on the drawings and specified elsewhere and may be
referenced in this paragraph.)
(2)
Composting.
(3) Recovery of metal from debris and sale to
recycling operation with Contractor retaining any
money derived from the sale.
(4) Collection of aluminum cans at the job site for
recycling.
(5) Old concrete to be recycled as riprap, road
base etc.
Coordinate the requirements in this paragraph with
UFGS-01572 CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT and UFGS-02220 DEMOLITION.
**************************************************************************
The Contractor shall participate in State and local government sponsored
recycling programs. [The Contractor is further encouraged to minimize
solid waste generation throughout the duration of the project.] [The
Contractor shall participate in the following recycling and waste
minimization activities to divert non-hazardous solid waste:[_____]].
3.8
NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
**************************************************************************
NOTE: The Designer must edit the Non-hazardous
Solid Waste Diversion Report to reflect the Using
Service's requirements.
**************************************************************************
The Contractor shall maintain an inventory of non-hazardous solid waste
diversion and disposal of construction and demolition debris. The
Contractor shall submit a report to [_____] through the Contracting Officer
on the first working day after each fiscal year quarter, starting the first
quarter that non-hazardous solid waste has been generated. The following
shall be included in the report:
a.
Construction and Demolition (C&D) Debris Disposed = [_____] in
SECTION 01355A
Page 23