3.6.2
Chemicals and Chemical Wastes
Chemicals shall be dispensed ensuring no spillage to the ground or water.
corrective action shall be performed and documented. This documentation
will be periodically reviewed by the Government. Chemical waste shall be
collected in corrosion resistant, compatible containers. Collection drums
shall be monitored and removed to a staging or storage area when contents
are within 150 mm 6 inches of the top. Wastes shall be classified,
managed, stored, and disposed of in accordance with Federal, State, and
local laws and regulations.
3.6.3
Hazardous wastes are defined in 40 CFR 261, or are as defined by
49 CFR 171 - 178. The Contractor shall, at a minimum, manage and store
hazardous waste in compliance with 40 CFR 262 [and shall manage and store
hazardous waste in accordance with the [Installation] [Project Office]
hazardous waste management plan]. The Contractor shall take sufficient
measures to prevent spillage of hazardous and toxic materials during
dispensing. The Contractor shall segregate hazardous waste from other
materials and wastes, shall protect it from the weather by placing it in a
berming or other appropriate measures against accidental spillage. The
Contractor shall be responsible for storage, describing, packaging,
labeling, marking, and placarding of hazardous waste and hazardous material
in accordance with 49 CFR 171 - 178, State, and local laws and regulations.
The Contractor shall transport Contractor generated hazardous waste off
and regulations. The Contractor shall dispose of hazardous waste in
compliance with Federal, State and local laws and regulations. Spills of
hazardous or toxic materials shall be immediately reported to the
Contracting Officer[ and the Facility Environmental Office]. Cleanup and
cleanup costs due to spills shall be the Contractor's responsibility. [The
disposition of Contractor generated hazardous waste and excess hazardous
materials are the Contractor's responsibility.] [The Contractor shall
coordinate the disposition of hazardous waste with the [Facility's]
[Project Office's] Hazardous Waste Manager and the Contracting Officer.]
3.6.4
Fuel and Lubricants
Storage, fueling and lubrication of equipment and motor vehicles shall be
conducted in a manner that affords the maximum protection against spill and
evaporation. Fuel, lubricants and oil shall be managed and stored in
accordance with all Federal, State, Regional, and local laws and
regulations. Used lubricants and used oil to be discarded shall be stored
in marked corrosion-resistant containers and recycled or disposed in
accordance with 40 CFR 279, State, and local laws and regulations. [There
shall be no storage of fuel on the project site. Fuel must be brought to
the project site each day that work is performed.] [Storage of fuel on the
project site shall be accordance with all Federal, State, and local laws
and regulations.]
3.6.5
Waste Water
**************************************************************************
NOTE: Edit the following paragraphs after
SECTION 01355A
Page 21