1.12.2
Time Averaged Perimeter Action Levels
[_____].
a. Concentration [_____].
b. Time
[_____].
1.12.3
Perimeter Sampling/Monitoring Location[s]
[_____].
1.12.4
Monitoring Instruments/Sampling and Analysis Methods
**************************************************************************
NOTE: UFGS-01450A CHEMICAL DATA QUALITY CONTROL
should be edited to reflect appropriate
instruments/sampling and analytical methods which
meet required action levels.
**************************************************************************
[_____].
1.12.5
Staffing
**************************************************************************
NOTE: See staffing requirements in UFGS-01450A
CHEMICAL DATA QUALITY CONTROL and assure that it is
edited so that qualified personnel are used to
operate instruments, take samples, and perform
analysis.
**************************************************************************
[_____].
PART 2
PRODUCTS (NOT USED)
PART 3
EXECUTION
**************************************************************************
NOTE: Edit and/or delete the following paragraphs
to reflect project requirements only.
**************************************************************************
3.1
ENVIRONMENTAL PERMITS AND COMMITMENTS
**************************************************************************
NOTE: The terms and conditions contained in any
environmental permits and environmental commitments
obtained by the Government must be made a part of
the contract. The design must be in accordance with
these permits and commitments. The title and
requirements of this paragraph may be changed to
include environmental reviews and approvals, if
pertinent. This paragraph shall be coordinated with
the SPECIAL ENVIRONMENTAL REQUIREMENTS paragraph.
If the Government has not obtained any environmental
permits, commitments, approvals, etc., the first
paragraph should be deleted and the second paragraph
should be used.
**************************************************************************
SECTION 01355A
Page 15