Management Instruction, under DA AR 200-5 Pest
Management or under Air Force Instruction AFI
32-1053 Pest Management Program.
The Designer should coordinate this section with
others sections requiring pesticide application
(02921 SEEDING, 02922 SODDING, 02923 SPRIGGING,
02930 EXTERIOR PLANTS, and 02935 LANDSCAPE
ESTABLISHMENT) and with the Installation's Pest
Management organization for any additional
requirements.
**************************************************************************
to, the following:
a. Name(s) of person(s) within the Contractor's organization who
is(are) responsible for ensuring adherence to the Environmental
Protection Plan.
b. Name(s) and qualifications of person(s) responsible for manifesting
hazardous waste to be removed from the site, if applicable.
c. Name(s) and qualifications of person(s) responsible for training
the Contractor's environmental protection personnel.
training program.
e. An erosion and sediment control plan which identifies the type and
location of the erosion and sediment controls to be provided. The plan
shall include monitoring and reporting requirements to assure that the
control measures are in compliance with the erosion and sediment
control plan, Federal, State, and local laws and regulations. A Storm
Water Pollution Prevention Plan (SWPPP) may be substituted for this
plan.
f. Drawings showing locations of proposed temporary excavations or
structures, sanitary facilities, and stockpiles of excess or spoil
materials including methods to control runoff and to contain materials
on the site.
g. Traffic control plans including measures to reduce erosion of
temporary roadbeds by construction traffic, especially during wet
weather. Plan shall include measures to minimize the amount of mud
transported onto paved public roads by vehicles or runoff.
h. Work area plan showing the proposed activity in each portion of the
area and identifying the areas of limited use or nonuse. Plan should
include measures for marking the limits of use areas including methods
for protection of features to be preserved within authorized work areas.
i.
Drawing showing the location of borrow areas.
j. The Spill Control plan shall include the procedures, instructions,
and reports to be used in the event of an unforeseen spill of a
substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or
regulated under State or Local laws and regulations. The Spill Control
SECTION 01355A
Page 10