b.
Procedures for system boot-up.
c.
Description of using the programs.
d.
Description of required operational sequences.
e.
Directory of all disk files.
f.
formats, command characters, and a sample of each type of data
transfer.
1.3.5.4
Operator's Manual
The operator's manual shall explain all procedures and instructions for
operation of the system including:
a.
Video switcher.
b.
Video multiplexer.
c.
Cameras and video recording equipment.
d.
Use of the software.
e.
Operator commands.
f.
System start-up and shut-down procedures.
g.
Recovery and restart procedures.
1.3.5.5
Maintenance Manual
The maintenance manual shall describe maintenance for all equipment
including inspection, periodic preventive maintenance, fault diagnosis, and
repair or replacement of defective components.
1.3.5.6
As-Built Drawings
The Contractor shall maintain a separate set of drawings, elementary
drawings. This set shall be accurately kept up to date by the Contractor
with all changes and additions to the CCTV system and shall be delivered to
the Government with the final endurance test report. In addition to being
complete and accurate, this set of drawings shall be kept neat and shall
not be used for installation purposes. Upon completion of the final system
drawings, a representative of the Government will review the final system
work with the Contractor. If the final system work is not complete, the
Contractor will be so advised and shall complete the work as required.
Final drawings submitted with the endurance test report shall be finished
drawings on mylar or vellum, and as AutoCAD or Microstation files on CD-ROM.
1.4
TESTING
1.4.1
General
The Contractor shall perform predelivery testing, site testing, and
adjustment of the completed CCTV system. The Contractor shall provide all
SECTION 16751A
Page 15