1.6.10
Software
The Contractor shall recommend all software updates to the Government for
approval. Upon Government approval, updates shall be accomplished in a
timely manner, fully coordinated with the CCTV system operators, operation
in the system verified, and shall be incorporated into the operations and
one scheduled update near the end of the first year's warranty period, at
which time the Contractor shall install and validate the latest released
version of the manufacturer's software.
PART 2
PRODUCTS
2.1
MATERIALS AND EQUIPMENT
All system hardware and software components shall be produced by
manufacturers regularly engaged in the production of CCTV equipment. Units
of the same type of equipment shall be products of a single manufacturer.
All material and equipment shall be new and currently in production. Each
major component of equipment shall have the manufacturer's name and
address, and the model and serial number in a conspicuous place. Equipment
located at the security center or a remote control/monitoring station shall
be rack mounted as shown. Both Television and Computing devices shall
comply with 47 CFR 15, Subpart B.
2.1.1
Fungus Treatment
**************************************************************************
NOTE: Fungus treatment should be used on equipment
to be installed in climates that are known to
promote fungus growth. Examples are: tropical
climates or humid, poorly ventilated areas.
**************************************************************************
System components located in fungus growth inductive environments shall be
completely treated for fungus resistance. Treating materials containing a
mercury bearing fungicide shall not be used. Treating materials shall not
increase the flammability of the component or surface being treated.
Treating materials shall not cause skin irritation or other injury to
personnel handling it during fabrication, transportation, operation,
maintenance, or during the use of the finished items when used for the
purpose intended.
2.1.2
All soldering shall be done in accordance with standard industry practices.
2.2
ENCLOSURES
**************************************************************************
NOTE: Designer will show on the drawings which
specific enclosure is needed. Show metallic
enclosures for very high security areas or when a
higher degree of tamper protection is desirable.
**************************************************************************
The Contractor shall provide metallic enclosures as needed for equipment
not housed in racks or supplied with a housing. The enclosures shall be as
specified or shown.
SECTION 16751A
Page 19