other sets to Contracting Officer. Coded diagrams are not
acceptable unless adequately identified.
SD-03 Product Data
Freight Elevators[; G][; G, [_____]]
Include information on motor, pump, gages, piston and cylinder,
accessories. For elevator supporting systems, include information
on car control [and emergency power] systems. On data sheets,
provide document identification number or bulletin number,
published or copyrighted prior to the date of contract bid opening.
Field Quality Control[; G][; G, [_____]]
A plan detailing the testing procedures shall be submitted [60]
[_____] days prior to performing the elevator tests.
Logic Control[; G][; G, [_____]]
and software and other specified requirements.
SD-05 Design Data
Reaction Loads[; G][; G, [_____]]
Calculations of reaction loads imposed on building by elevator
system that comply with ASME A17.1. Calculations shall be
certified by a Registered Professional Engineer. Do not fabricate
materials nor perform construction until approved by Contracting
Officer.
Heat Loads[; G][; G, [_____]]
Calculations for total anticipated heat loads generated by all
the elevator machine room equipment. A Registered Professional
Engineer will provide certified calculations. Do not fabricate
materials nor perform construction until approved by the
Contracting Officer.
SD-06 Test Reports
Field Tests Reports[; G][; G, [_____]]
Test reports in booklet form showing all field tests performed to
adjust each component and all field tests performed to prove
compliance with the specified performance criteria, upon
completion and testing of installed system shall be submitted [14]
[_____] days after the successful completion of testing.
SD-07 Certificates
Qualifications[; G][; G, [_____]]
[A letter no later than 14 days [_____] after the Notice to
Proceed providing the name and Statement of Qualifications,
SECTION 14240
Page 9