factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
elevation showing the arrangement of elevator equipment,
accessories, supporting systems, anchorage of equipment,
clearances for maintenance and operation; and details on hoistway,
doors and frames, operation and signal stations, controllers,
motors, guide rails and brackets, cylinder and plunge unit, and
points of interface with normal power [fire alarm system] [HVAC or
Provide drawings to show any revised building electrical system
required to make supplied elevator system function as specified.
connections and other details required to demonstrate sequence of
operations and functions of system devices. Drawings shall
which are frequently different from National Electrical Code
glass cover, framed and mounted in elevator machine room. Deliver
SECTION 14240