required below with activity.
**************************************************************************
Provide routine warranty service in accord with manufacturer's warranty
requirements, for period of [12] [_____] months after date of acceptance by
Contracting Officer. [Perform work during regular working hours]. Include
24-hour emergency service, with 1 hour response time, during this period
without additional cost to Government. Include adjustments, greasing,
oiling, and cleaning. Provide routine inspection and tests of elevators in
accordance with ASME A17.1 Section 8.11.3 and ASME A17.2.2. Provide
supplies and parts to keep elevator system in operation. Perform service
only by factory trained personnel. The Contractor shall maintain a
maintenance log of all service orders performed during the warranty period
and shall submit it to the Contracting Officer 21 days prior to the end of
the warranty period.
1.5.1
Special Operations
Every six months, test systems for [Emergency Power Operation,] [Earthquake
Emergency Operations,] [Hospital Emergency Commandeering Service
Operations] [and] Firefighters' Service. Schedule to not interfere with
building operations. For Firefighters' Service, test monthly in accordance
with ASME A17.1, Section 8.6.10.1. Provide written results of each test
operation to the Contracting Officer.
1.5.2
Documentation
Document all inspection and testing.
Maintain copy of documentation in
machine room.
1.5.3
Maintenance and Diagnostic Tools
Provide all special tools and software necessary to service and maintain
each elevator; deliver at time of final acceptance. Provide one of each
diagnostic tools if unavailable on the open market. Provide necessary
diagnostic software where the solid state or microprocessor diagnostic
tools are available on the open market
1.5.4
Keys for Elevator Key Switches
Provide minimum of twelve keys per unique cylinder used on all key switches
for single elevator. If more than one elevator, additional keys not
required unless there are additional unique cylinders. Keys shall be
provided with brass or fiberglass tags marked 'PROPERTY OF THE U. S.
GOVERNMENT' on one side with function of key or approved code number on
other side.
1.6
MAINTENANCE AND REPAIR ACTION PLAN
Provide plan of action prepared by the Elevator Specialist to provide
emergency and routine maintenance in accordance with paragraph titled NEW
INSTALLATION SERVICE. Provide a list of phone numbers, personnel contacts,
and all tools to the Contracting Officer.
SECTION 14240
Page 12