3.5
Do not permit personnel not directly involved with the project to enter
work zones, called the EZ and CRZ. The EZ shall be an area around the tank
a minimum of 3 m 10 feet from the limits of the tank excavation. At the
perimeter of the EZ, establish a CRZ. Limits of the CRZ shall be
established by the Contractor. Within the CRZ, equipment and personnel
shall be cleaned as stated in the paragraph entitled "Personnel and
Equipment Decontamination." The Contractor's site office, parking area,
and other support facilities shall be located outside the EZ and CRZ.
Boundaries of the EZ and CRZ shall be clearly marked and posted. Include a
site map, outlining the extent of work zones and location of support
facilities, in the SSHP.
3.6
TRAINING
Provide health and safety training in accordance with 29 CFR 1910 prior to
starting work. Furnish copies of current training certification statements
for personnel prior to initial entry into the work site.
3.6.1
On-Site Training
Prior to starting on-site work, a health and safety training class shall be
held by the SSHO [CIH] to discuss the implementation of the SSHP. Notify
the Contracting Officer 24 hours prior to beginning the training class.
3.6.2
Training Outline
Provide the following:
a.
Health and safety organization, including discussion of
distribution of functions and responsibilities
b.
Organization and components of the SSHP
c.
Physical and chemical site hazard identification
d.
Basic toxicology and toxicity information
e.
Discussion of the EZ and CRZ
f.
g.
Respiratory protection
h.
Air quality monitoring
i.
Personnel exposure guidelines
j.
Decontamination procedures
k.
l.
Emergency procedures and contingency plan
m.
Site entry and exit procedures
n.
Sampling procedures
SECTION 02115N