emulsions in accordance with applicable local, State, and Federal
regulations. Drums or tanks used for containerizing waste fuel will be
furnished by the [Contractor] [Government]. Oil/water separator for fuel
will be furnished by the [Contractor] [Government].
c.
Identification of Tanks With Hazardous Waste Sludge and Residue
**************************************************************************
NOTE: Information on the hazardous waste
characteristics of sludge in tanks should be
provided by the activity. If not, sampling and
analysis must be conducted during the 0 to 35
percent design stage to properly define scope and
costs.
**************************************************************************
The following [tank is] [tanks are] known or suspected to contain hazardous
wastes:
Tank No.
Product
Hazardous Waste, Status, Type, and Basis Known
[or Suspect]
[1]
[MOGAS]
[Sludge and sandblast residue; ignitibility and lead]]
3.17
TEMPORARY CONTAINMENT OF EXCAVATED SOIL
Provide temporary containment area near the excavated area. Cover
containment area with 0.75 mm 30 mil polyethylene sheeting. Place
excavated soil on the impervious barrier and cover with 0.15 mm 6 mil
polyethylene sheeting. Provide straw bale berm around the outer limits of
the containment area and cover with polyethylene sheets. Secure edges of
sheets to keep the polyethylene sheeting in place.
3.18
EXCAVATION
[Provide Contracting Officer with written documentation, no later than 30
days before work begins, that proper State or local authorities have been
notified.] Notify the Contracting Officer at least 48 hours prior to start
of tank removal work. Stage operations to minimize the time that tank
excavation is open and the time that contaminated soil is exposed to the
weather. Provide protection measures around the excavation area to prevent
water runoff and to contain the soil within the excavation area.
3.18.1
Excavation Procedures
**************************************************************************
dependent on regulations applicable to the location
where tanks and piping are being removed. Specifier
must verify acceptable levels.
For some locations, such as a contaminated site
scheduled for site remediation, it may be
permissible to use contaminated soil materials for
shall get approval from local regulating authority
before using contaminated soil materials.
If contaminated soil materials are approved for
SECTION 02115N
Page 14