a.
Complete UST Notification Form (within 30 days of closure).
b.
Description of work, including removal procedures, number of tanks
removed, identification of tanks removed and disposed of, cubic
yards of excavated soil, location of disposal sites, and dates of
excavation.
c.
Site plan, including location of tanks and piping, limits of
excavation, sampling points, results of excavation, and depths.
d.
Laboratory testing reports, copies of data and test results from
testing laboratory.
e.
Tank disposal paperwork, contaminated soil disposal paperwork, and
contaminated water disposal paperwork.
f.
Certifications required by implementing agency.
g.
Building permit[, inspection permits,] and other permitsrequired
for underground tank removal, notifications, and inspection
reports.
[h.
Cumulative quantities of soil excavated, beginning with start
date for each tank and associated piping.]
3.25
SPILLS OF CONTAMINATED SOILS
Use appropriate vehicles and operating practices to prevent spillage or
vehicles leaving the area of contamination to ensure that no contaminated
materials adhere to the wheels or undercarriage.
3.26
**************************************************************************
NOTE: LANTNAVFACENGCOM projects should use
LANTNAVFACENGCOM Section 02315N in lieu of Section
02300 below.
**************************************************************************
Provide backfill, compaction, grading, and seeding in accordance with
Section 02300 EXCAVATION. [Line the excavation with two plastic sheets
before backfilling.]
-- End of Section --