3.7
PERSONNEL PROTECTION
clean and well maintained. Furnish three clean sets of personal protective
equipment and clothing for use by the Contracting Officer or official
visitors as required for entry into the EZ.
3.8
RESPIRATORY PROTECTION PROGRAM
Develop a respiratory protection program, addressing respirator usage and
training, in accordance with 29 CFR 1910 and EM 385-1-1.
3.9
DECONTAMINATION
clothing worn in contaminated areas at the end of the work day. The SSHO
and equipment are decontaminated before being reissued.
3.10
FIRST AID AND EMERGENCY RESPONSE EQUIPMENT AND PROCEDURES
Provide appropriate emergency first aid equipment for treatment of exposure
to site physical and chemical hazards. Provide and post a list of
emergency phone numbers and points of contact for fire, hospital, police,
ambulance, and other necessary contacts. Provide and post a route map
detailing the directions to the nearest medical facility.
3.11
IGNITION SOURCES
Do not permit ignition sources in the EZ and CRZ.
3.12
PERSONNEL AND EQUIPMENT DECONTAMINATION
Decontaminate personnel and equipment before exiting the work zones.
3.13
WASTE DISPOSAL
The SSHP shall detail the practices and procedures to be utilized to
dispose of wastes. Upon completion of the project, certify that equipment
and materials were properly decontaminated prior to being removed from the
site.
3.14
EMERGENCY RESPONSE REQUIREMENTS
Furnish emergency response and contingency plan in accordance with 29 CFR
1910. In an emergency, take action to remove or minimize the cause of the
emergency, alert the Contracting Officer, and institute necessary measures
to prevent repetition of the emergency. Equip site-support vehicles with
route maps providing directions to the medical treatment facility.
3.15
UNFORESEEN HAZARDS
Notify the Contracting Officer of any unforeseen hazard or condition which
becomes evident during work.
3.16
ADDITIONAL REQUIREMENTS
**************************************************************************
SECTION 02115N
Page 12