Incorporate reports, records, and data into a single binder with
the title "SITE ASSESSMENT REPORT" on the cover of the binder.
[
Cumulative quantities of soil excavated; G
Beginning with start date for each tank and associated piping]
1.4
**************************************************************************
NOTE: Unit prices for removal and disposal of
temporarily stockpiled contaminated soil which was
excavated for tank and piping removal, provision of
clean fill material to replace contaminated soils
and removal and disposal of temporarily stored
contaminated water shall be included in Section
00200, "Instructions to Bidders" as follows:
UNIT
NO.
ITEM
UNIT
PRICE
UNITS
EXTENSION
Removal and
CUBIC METERS
[$_____]
[_____]
[_____]
disposal of
stockpiled
contaminated soils
removal of under-
ground storage
tanks and
associated piping.
Furnish clean
CUBIC METERS
[$-----]
[-----]
[$-----]
fill material for
use in backfilling
excavations for
removal of
underground storage
tanks and piping.
Removal and
LITERS
[$-----]
[-----]
[$-----]
disposal of
stored contaminated
water collected
during dewatering
to remove
underground storage
tanks and piping.
Quantities of
contaminated soils,
fill material and
contaminated water
shall be estimated
taking into
consideration site
conditions, and age
and history of tanks.
SECTION 02115N
Page 7