UNIT
NO.
ITEM
UNIT
PRICE
UNITS
EXTENSION
Removal and
CUBIC YARDS
[$_____]
[_____]
[_____]
disposal of
stockpiled
contaminated soils
removal of under-
ground storage
tanks and
associated piping.
Furnish clean
CUBIC YARDS
[$-----]
[-----]
[$-----]
fill material for
use in backfilling
excavations for
removal of
underground storage
tanks and piping.
Removal and
GALLONS
[$-----]
[-----]
[$-----]
disposal of
stored contaminated
water collected
during dewatering
to remove
underground storage
tanks and piping.
Quantities of
contaminated soils,
fill material and
contaminated water
shall be estimated
taking into
consideration site
conditions, and age
and history of tanks.
For some locations, such as a contaminated site
scheduled for site remediation, it may be
permissible to use contaminated soil materials for
shall get approval from local regulating authority
before using contaminated soil materials.
**************************************************************************
Assume for bidding purposes that soil, [bituminous pavement, concrete
slabs,] and water encountered during the removal of the underground tanks
are contaminated with [JP-5 fuel oil] [and] [diesel fuel] [and] [gasoline]
and shall be handled as specified herein. [Payment for removal from
temporary stockpile and disposal of contaminated soil and furnishing clean
soil shall be paid for at the contract unit price per cubic meter cubic yard.]
Bituminous pavement and concrete slabs shall be washed and disposed of as
demolition debris. Wash water shall be collected and stored. [Disposal of
contaminated water shall be paid for at the contract unit price per gallon.]