loading; and load charts based on calculated list and trim. The
amount of list and trim shall be within the crane manufacturer's
requirements.]
e. Fall Protection and Prevention (FP&P) Plan. The plan shall be site
specific and address all fall hazards in the work place and during
different phases of construction. It shall address how to protect and
prevent workers from falling to lower levels when they are exposed to
fall hazards above 1.8 m (6 feet). A qualified person for fall
protection shall prepare and sign the plan. The plan shall include
fall protection and prevention systems, equipment and methods employed
for every phase of work, responsibilities, assisted rescue, self-rescue
methods. Fall Protection and Prevention Plan shall be revised [every
six months] for lengthy projects, reflecting any changes during the
course of construction due to changes in personnel, equipment, systems
or work habits. The accepted Fall Protection and Prevention Plan shall
be kept and maintained at the job site for the duration of the project.
The Fall Protection and Prevention Plan shall be included in the
Accident Prevention Plan (APP).
[
f.
Occupant Protection Plan. The safety and health aspects of
lead-based paint removal, prepared in accordance with Section 13281N
LEAD BASED PAINT HAZARD ABATEMENT, TARGET HOUSING & CHILD OCCUPIED
FACILITIES 13283N REMOVAL AND DISPOSAL OF LEAD CONTAINING PAINT.]
[
g.
Lead Compliance Plan. The safety and health aspects of lead work,
prepared in accordance with Section 13282N LEAD IN CONSTRUCTION.]
[
h. Asbestos Hazard Abatement Plan. The safety and health aspects of
asbestos work, prepared in accordance with Section 13280N ASBESTOS
ABATEMENT 13281N ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS.]
[
i. Site Safety and Health Plan. The safety and health aspects prepared
in accordance with Section 01351 SAFETY HEALTH AND EMERGENCY RESPONSE
(HTRW/UST).]
[
j. PCB Plan. The safety and health aspects of Polychlorinated
Biphenyls work, prepared in accordance with Sections 13284 REMOVAL AND
DISPOSAL OF POLYCHLORINATED BIPHENALS and 13285 REMOVAL AND DISPOSAL OF
PCB CONTAMINATED SOILS.]
[
k. Site Demolition Plan. The safety and health aspects prepared in
accordance with Section 02220 DEMOLITION and referenced sources.[
Include engineering survey as applicable.]]
[
l. Excavation Plan. The safety and health aspects prepared in
accordance with Section 02300 EARTHWORK.]
1.8
ACTIVITY HAZARD ANALYSIS (AHA)
The Activity Hazard Analysis (AHA) format shall be in accordance with USACE
EM 385-1-1. Submit the AHA for review at least [15 ][_____]calendar days
prior to the start of each phase. Format subsequent AHAs as amendments to
the APP. The analysis should be used during daily inspections to ensure the
implementation and effectiveness of the activity's safety and health
controls.
The AHA list will be reviewed periodically (at least monthly) at the
SECTION 01525
Page 17