unresolved safety and health deficiencies shall be posted on the safety
bulletin board.
g. Ensure sub-contractor compliance with safety and health
requirements.
Failure to perform the above duties will result in dismissal of the
superintendent and/or SSHO, and a project work stoppage. The project work
stoppage will remain in effect pending approval of a suitable replacement.
[1.6.2.2
[Certified Safety Professional (CSP)][Certified Industrial
Hygienist (CIH)][Associate Safety Professional (ASP)][Certified Safety
Trained Supervisor (STS)][and/or][Certified Construction Health & Safety
Technician (CHST)]
**************************************************************************
NOTE: When the requirement for a CSP, CIH, ASP, STS
and/or CHST is included, this paragraph shall also
be included.
**************************************************************************
a.
inspections, and safety enforcement for the project.
b.
as defined by USACE EM 385-1-1.
c.
Be on-site [at all times][at least weekly][at least
monthly][_____] whenever work or testing is being performed.
d.
Conduct and document safety inspections.
e.
Shall have no other duties other than safety and occupational
health management, inspections, and enforcement on this contract.
If the [CSP][CIH][ASP][STS][CHST] is appointed as the SSHO all duties of
that position shall also be performed.
]1.6.3
Meetings
1.6.3.1
Preconstruction Conference
a. Contractor representatives who have a responsibility or significant
role in accident prevention on the project shall attend the
preconstruction conference. This includes the project superintendent,
site safety and health officer, quality control supervisor, or any
other assigned safety and health professionals who participated in the
development of the APP (including the Activity Hazard Analyses (AHAs)
and special plans, program and procedures associated with it).
b. The Contractor shall discuss the details of the submitted APP to
include incorporated plans, programs, procedures and a listing of
anticipated AHAs that will be developed and implemented during the
performance of the contract. This list of proposed AHAs will be
reviewed at the conference and an agreement will be reached between the
Contractor and the Contracting Officer's representative as to which
phases will require an analysis. In addition, a schedule for the
preparation, submittal, review, and acceptance of AHAs shall be
established to preclude project delays.