Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
[
SD-03 Product Data
Engine-generator set data; G
Engine-generator set efficiencies; G
Diesel engine data; G
Diesel engine-generator set; G
Remote alarm annunciator; G
SD-05 Design Data
Capacity calculations for engine-generator set; G
Calculations for brake mean effective pressure; G
Capacity calculations for batteries; G
[
Turbocharger load calculations; G]
SD-06 Test Reports
Acceptance checks and tests; G
Functional acceptance tests; G
Functional acceptance test procedure; G
SD-07 Certificates
Vibration isolation system certification; G
Start-up engineer qualification resume; G
Instructor's qualification resume; G