Functional Performance Test Checklist - VAV Terminals
point adjustment. Changes to be cooling setpoint to heating set point and
return to cooling set point. __________ Verify cooling damper closes to
minimum position, blower fan energizes according to sequence of operation,
and upon further drop in space temperature, heating coil activation and
(2)
Check primary air damper maximum/minimum flow settings.
Maximum flow setting
[_____] L/s
Minimum flow setting
[_____] L/s
(3)
Check blower fan flow. [_____] L/s
Maximum flow setting
[_____] cfm
Minimum flow setting
[_____] cfm
(3)
Check blower fan flow. [_____] cfm
(4) Verify free operation of fan backdraft damper (insure no
primary air is being discharged through the recirculated air register).
_____________________________________________________________________________
(5) Verify that no recirculated air is being induced when box is in
full cooling. ______________________________________________________________
2. Certification: We the undersigned have witnessed the above functional
performance tests and certify that the item tested has met the performance
requirements in this section of the specifications.
Signature and Date
Contractor's Chief Quality Control Representative
_____________________________
Contractor's Mechanical Representative
_____________________________
Contractor's Electrical Representative
_____________________________
Contractor's Testing, Adjusting and Balancing Representative
_____________________________
Contractor's Controls Representative
_____________________________
Contracting Officer's Representative
_____________________________
Using Agency's Representative
_____________________________
SECTION 15995A
Page 41