Functional Performance Test Checklist - Single Zone Air Handling Unit
For Air Handling Unit: [_____]
(1) All dampers in normal position.
______________________________
(2) All valves in normal position.
_______________________________
(3)
Fan de-energizes.
___________________________________________
f. Verify cooling coil and heating coil operation by varying
thermostat set point from cooling set point to heating set point and
returning to cooling set point. ____________________________________________
g.
Verify safety shut down initiated by smoke detectors. _____________
h. Verify safety shut down initiated by low temperature protection
thermostat.
_______________________________________________________________
2. Certification: We the undersigned have witnessed the above functional
performance tests and certify that the item tested has met the performance
requirements in this section of the specifications.
Signature and Date
Contractor's Chief Quality Control Representative
_____________________________
Contractor's Mechanical Representative
_____________________________
Contractor's Electrical Representative
_____________________________
Contractor's Testing, Adjusting and Balancing Representative
_____________________________
Contractor's Controls Representative
_____________________________
Contracting Officer's Representative
_____________________________
Using Agency's Representative
_____________________________
SECTION 15995A
Page 45