ee.
Motor starter:
As specified in FS XX-C-2816.
ff.
Provision for limitation of starting current inrush:
[Required]
[Not required] [Not applicable].
gg.
Type Drive:
[Direct drive] [Multi-V-Belt drive].
Direct drive coupling: [Close-coupled] [Integral-coupled]
[Flexible-coupled] [Not applicable].
hh.
[Not required] [Required].
ii.
Not required.
jj.
Cleaning, treatment, and painting:
[As specified in FS XX-C-2816
] [Other: (specify)].
kk.
Cleaning, treatment and painting in accordance with Section 09900
PAINTS AND COATINGS.
ll.
Color of finish coat: [Manufacturer's standard]
[Other:
[_____]-(specify)-Samples required.]
mm.
Initial lubrication:
Factory lubrication service required.
nn.
Skid base (Type II or III):
Required.
oo.
Lifting attachments and tiedown device: Lifting attachments as
required. Tiedown devices [required.] [Not required.]
pp.
Spare parts and maintenance tools:
Not required.
qq.
Tool boxes:
Not required.
rr.
Production pack inspection:
Not required.
ss.
Level of preservation packaging, and packing: Level C or better
(Delivery of unit to project site in undamaged condition is
Contractor's responsibility.)
tt.
Preservation-packaging:
Not applicable.
2.2
LOW PRESSURE AIR COMPRESSOR UNIT, LESS THAN 7 1/2 kW 10 HP
(gage) 125 psig, shall conform to the following.
2.2.1
Compressor and Receiver Capacity
Sized as indicated.
[Oil-free air] [Air] delivered at indicated pressure.
2.2.2
Mounting
Common sub-base for receiver and compressor.
2.2.3
Compressor Type
Reciprocating [or rotary].
SECTION 15211N
Page 15