f. Location of control panels, detectors, manual stations,
supervisory switches, solenoids, notification appliances, and
other electrical devices. In addition, conduit routing and sizes,
and the number of conductors contained in each shall be indicated.
g. Longitudinal and transverse building sections showing
typical branch line and crossmain pipe routing and elevation of
each typical sprinkler above finished floor.
h. Equipment room layout drawings drawn to a scale of not less
than 1:20 1/2 inch equals 1 foot to show details of each system
component, clearances between each other and from other equipment
and construction in the room.
i. Details of each type of pipe hanger, sway bracing for
earthquake protection, restraint of underground water main at
point-of-entry into the building, proportioners, nozzles and
mounting details, AFFF system control valve header and related
components.
j. Connection drawings and control diagrams indicating overall
electrical and mechanical operation of the AFFF system. This
shall include identification and operation of each major component
of the system. Diagrams shall be supplemented with a narrative
indicate foam system control panel wiring and make and model of
devices and equipment connected thereto.
controller and all interconnecting wiring to foam concentrate
pumps and other components connected to the controller. Such
drawing shall be specifically prepared for the project
accepted.
As-built Drawings
One set of reproducible and six copies, within 14 calendar days
after successful completion of required testing. A separate set
of approved submittal drawings of the overall system, marked up to
indicate as-built conditions, shall be maintained on site. These
drawings shall be maintained in a current condition at all times
and shall be made available for review immediately upon request
during normal working hours. Variations from the approved
drawings, for whatever reason, including those occasioned by
modifications, change orders, optional materials, and/or required
for coordination between trades shall be indicated in sufficient
detail to accurately reflect the as-built conditions.
SD-03 Product Data
Materials and Equipment[; G][; G, [_____]]
Manufacturer's catalog data for each separate piece of equipment
proposed for use in the system. Data shall indicate the name of
the manufacturer of each item of equipment, with data highlighted
to indicate model, size, options, etc. proposed for installation.
model number, and quantity shall be provided.