[1.3.3
Regulatory Requirements
[____].
]1.3.4
Pesticide Applicators
Provide certifications for all individuals (applicators) who will be
working with creosote products on site. All applicators shall be certified
of 40 CFR 171) to use wood preservatives, and have completed an approved
EPA training program on the use of creosote products.
1.3.5
Best Management Practices (BMPs)
The producer of the treated wood products shall provide certification that
Best Management Practices (BMPs) for the use of Treated Wood in Aquatic
Environments were utilized including a written description and appropriate
documentation of the BMPs utilized.
1.4
DELIVERY, STORAGE, AND HANDLING
Handle and store piles in accordance with AWPA M4. Comply with paragraph
entitled "MSDS and CIS." Special care shall be taken in supporting piles
to prevent the including of excessive bending stresses in the piles. Piles
shall be carefully handled without dropping, breaking of outer fibers, and
penetrating the surface with tools. Peaveys, cant hooks, pikes, and other
pointed tools shall not be used in handling treated piles.
**************************************************************************
NOTE: For NAVFAC (Navy) projects, use and edit the
appropriate following paragraph(s) Do not use for
Army projects.
**************************************************************************
[1.5
BASIS OF BIDS
]1.5.1
For Bearing Piles
**************************************************************************
NOTE: Choose one of the following options.
**************************************************************************
**************************************************************************
NOTE: Choose this option for lump sum bidding of
piles. This option should be used in all projects
except those where exact quantities cannot be
practically determined prior to the actual work.
Numbers of piles, pile capacity, pile locations, and
tip and cutoff elevations shall be clearly shown on
the drawings.
**************************************************************************
**************************************************************************
NOTE: Use the second paragraph for unit price
bidding of piles. Specify unit price bid items for
piles only for projects where exact quantities
cannot be practically determined prior to the actual
work. Lengths of piles must be determined as
accurately as possible prior to bidding, since the
SECTION 02461
Page 9