increase or decrease in number of pile load tests.]
][1.5.3
For [Fender] [Cluster] [, and] [Dolphin] [_____] Piles
Base bids on the number, circumference, and length of piles from tip to
cutoff as indicated.]
**************************************************************************
NOTE: For USACE (Army) projects, use and edit the
appropriate following paragraph(s). Do not use for
Navy projects.
**************************************************************************
[1.6
UNIT PRICES
**************************************************************************
NOTE: If Section 01270, "Measurement and Payment",
paragraph title (UNIT PRICES) should be deleted from
this section and the remaining appropriately edited
subparagraphs below should be inserted into Section
01270.
**************************************************************************
]1.6.1
Round Timber Piles, [Vertical] [Batter]
1.6.1.1
Payment
**************************************************************************
NOTE: The tabulation shown below is for
illustration only and should be revised if not
applicable to the job for which the specifications
are being prepared. The factors for unit price
increase (for piles of increased length) should
approximate the estimated increased cost to the
Contractor for furnishing and driving the longer
piles based on estimated cost of material and
foundation conditions anticipated.
**************************************************************************
Payment for each acceptably driven pile will be made at the applicable
contract price per linear meter foot as determined by the length and type
of pile specified or directed to be driven; this price includes all items
incidental to furnishing and driving the piles, redriving uplifted piles,
any required notching, the cutting off of all piles at the cutoff
elevation, [and the preservative treatment of the tops of treated piles
which are headed] but exclusive of any capping of heads. Payment for piles
driven in lengths as required up to and including [_____] meters feet in
place below the cutoff elevation will be made at the applicable basic
contract unit prices. Payment for piles driven in required lengths greater
than [_____] meters feet will be made at an adjusted unit price. The
adjusted unit price will be obtained by multiplying the applicable basic
contract unit price by the applicable factor shown in the table below. The
unit price so adjusted will be the applicable contract unit price for the
length of pile driven below cutoff elevation.