accordance with all local, State and Federal laws and regulations,
and the terms and conditions of the contract within sixty (60)
days after the materials have been generated. These services will
include all necessary personnel, labor, transportation, packaging,
detailed analysis (if required for disposal, and/or
transportation, including manifesting or completing waste profile
sheets, equipment, and the compilation of all documentation is
required).
b.
Contain all waste in accordance with 40 CFR 260, 40 CFR 261, 40
CFR 262, 40 CFR 263, 40 CFR 264, 40 CFR 265, 40 CFR 266, 40 CFR 268,
40 CFR 270, 40 CFR 272, 40 CFR 273, 40 CFR 279, 40 CFR 280, and 40
CFR 761.
c.
Control and turn in all hazardous waste requiring disposal in
accordance with Norfolk Naval Shipyard Recovery Material
Instruction contained in this specification entitled "Contractor
Disposal Turn-In Requirements".
d.
Obtaining a representative sample of the material generated for
each job done to provide waste stream determination.
e.
Analyzing for each sample taken and providing analytical results
to the Contracting Officer. Provide two copies of the results.
f.
Determine the DOT proper shipping names for all waste (each
container requiring disposal) and will demonstrate how this
determination is developed and supported by the sampling and
analysis requirements contained herein to the Contracting Officer
for Code 106's review.
Government Responsibilities
To review all documentation submitted by the Contractor for accuracy.
Provide guidance to the Contractor in reference to environmental compliance.
Interim Waste Generation Site for Contractor Disposal of WHM/HW
The Contractor will request approval of the Government for an area suitable
for packaging WHN/HW requiring disposal. The Contractor will comply with
the requirements of the Virginia Department of Waste Management
Regulations. The area will be barricaded and a sign identifying as follows:
Signage- "DANGER - UNAUTHORIZED PERSONNEL KEEP OUT"
With additional custody sign indicating:
(1) Site #
(2) Controlled by
Call Mr./Ms. [____] at
Barricade Type: Yellow and black three (3) inch plastic tape.
Corner
barricades will be provided by the Government.
Contractor Disposal Turn-In Requirements
requires the Contractor to dispose of, the following conditions must be
complied with:
SECTION 01575N
Page 25