and adjacent to the site.
Submit a report for the record.
1.6.2
Solid Waste Disposal Permit
Submit one copy of a [State] [and] [local] permit or license showing such
[agency's] [agencies'] approval of the disposal plan before transporting
1.6.3
Waste Determination Documentation
The Contractor will complete a Waste Determination form (provided at the
pre-construction conference) for all contractor derived wastes to be
generated. The waste determination must be based upon either a constituent
listing from the manufacturer used in conjunction with consideration of the
process by which the waste was generated, EPA approved analytical data, or
not adequate). All support documentation must be attached to the Waste
Determination form. As a minimum, a Waste Determination form must be
provided for the following wastes (this listing is not all inclusive): oil
and latex based painting and caulking products, solvents, adhesives,
aerosols, petroleum products, and all containers of the original materials.
1.6.4
Disposal Documentation for Hazardous and Regulated Waste
Submit a copy of the applicable EPA [and State] permit(s), manifest(s), or
license(s) for transportation, treatment, storage, and disposal of
hazardous and regulated waste by permitted facilities.
1.6.5
Contractor 40 CFR Employee Training Records
**************************************************************************
NOTE: Insert the bracketed text for projects on a
Large Quantity Generator Facility. See paragraph
entitled "Facility Hazardous Waste Generator Status"
for determination of generator status.
**************************************************************************
Prepare and maintain employee training records throughout the term of the
contract meeting applicable 40 CFR requirements. [The Contractor will
ensure every employee completes a program of classroom instruction or
on-the-job training that teaches them to perform their duties in a way that
ensures compliance with Federal, State and local regulatory requirements
for RCRA Large Quantity Generator. The Contractor will provide a Position
Description for each employee, by subcontractor, based on the Davis-Bacon
Wage Rate designation or other equivalent method, evaluating the employee's
association with hazardous and regulated wastes. This Position Description
will include training requirements as defined in 40 CFR 265 for a Large
Quantity Generator facility.] Submit these training records to the
Contracting Officer at the conclusion of the project, unless otherwise
directed.
1.6.6
Regulatory Notification
The Contractor is responsible for all regulatory notification requirements
in accordance with Federal, State and local regulations. The Contractor
will forward copies to the Contracting Officer prior to commencement of
work activities. Typically, regulatory notifications must be provided for
the following (this listing is not all inclusive): demolition, renovation,
NPDES defined site work, remediation of controlled substances (asbestos,