1.4.4
Group IV Technical Data Package
1.4.4.1
Performance Verification and Endurance Testing Data
**************************************************************************
NOTE: Insert section number and title for the UMCS,
IDS, ESS or CCTV specification.
**************************************************************************
The Contractor shall prepare procedures and reports for the performance
verification test and endurance test. Test procedures shall be prepared in
accordance with Section [_____] and this specification. Testing shall be
performed on an installed system as approved by the Government. Where
required and approved by the Government, the Contractor shall simulate
conditions of operation to demonstrate the performance of the system. The
test plan shall describe the applicable tests to be performed, other
pertinent information such as specialized test equipment required, length
of performance verification test and endurance test, and location of the
performance verification test and endurance test. The procedures shall
explain in detail, step-by-step actions and expected results to demonstrate
compliance with the requirements of this specification, and the methods for
simulating the necessary conditions of operation to demonstrate performance
of the system. The test report shall describe the results of testing to
include the date, time, location and system component designations of
material and equipment tested. Testing action shall be recorded whether
successful or not. Reasons for termination of testing for any reason shall
be recorded in the report. Testing work sheets, printouts, strip charts,
oscilloscope or OTDR printouts/photographs, raw data, analyzed data and
testing conclusions shall be included in the report. The Contractor shall
deliver the performance verification test and endurance test procedures to
the Government for review and approval. After receipt of written approval
of test procedures, the Contractor may schedule the performance
verification and endurance tests. The Contractor shall provide written
notice of the performance verification test and the endurance test to the
Government at least 2 weeks prior to the scheduled start of the test. The
final performance verification test and endurance test report shall be
delivered 30 days after completion of testing.
1.4.4.2
Operation and Maintenance Data
A draft copy of the operation and maintenance data, in manual format, as
specified for the Group V technical data package, shall be delivered to the
Government prior to beginning the performance verification test for use
during site testing.
1.4.4.3
Training Data
Lesson plans and training manuals, including type of training to be
by the Government prior to starting any training.
1.4.5
Group V Technical Data Package
**************************************************************************
NOTE: Specify the correct number of manuals on DD
Form 1423. Adjust the quantities below to fill
special local requirements. Coordinate O&M manual
requirements with those of the performing district.