NFPA 99, and EIA ANSI/TIA/EIA-569-A.
1.5.2.3
a. The installed system shall conform to the EMI standards specified in 47
CFR 15 rules and regulations, for EMI caused by computing devices.
b. Within the normal medical facility environment, the installed system
shall not generate nor be susceptible to any harmful electromagnetic
emission, radiation, or induction that degrades, obstructs, or interrupts
the operation of the installed system, and any computer system, life safety
system, or patient monitoring system in the facility.
c. In the event that any part of the system is subject to CFR technical
standards different from those set forth herein, including without
limitation the requirement that those computing devices marketed for use in
business or industrial environments are certified by the FCC to comply with
the Class B limit of the FCC Rules, such CFR standards shall apply in lieu
of those set forth herein.
d. In the event that, at the time of system acceptance testing, the
applicable CFR technical standards shall differ from those set forth above,
the system as installed shall conform to such then applicable CFR technical
standards.
e. In the event of a breach of the representations and warranties
contained herein, the system Contractor shall, at their own expense, take
all measures necessary to put the offending system into compliance with the
applicable CFR technical standards.
1.6
DELIVERY, STORAGE AND HANDLING
1.6.1
Protection
All products delivered and placed in storage shall be stored with
protection from the weather, humidity and temperature variation, dirt and
1.6.2
Delivery Coordination
Coordinate deliveries with the Contracting Officer to insure a timely
installation.
1.6.3
Loss Liability
The system Contractor shall be liable for any loss due to delivery and
storage problems.
1.6.4
Delivery Restrictions
a. No products or installation material shall be delivered to the job site
more than one month prior to commencement of its installation.
b. System products shall not leave the factory prior to six months before
the time that the facility is ready for installation of the products.
Obtain prior written approval of the shipping date from the Contracting
Officer.
SECTION 16730A
Page 26