three rings, including a separate section for each test.
Sections
shall be separated by heavy plastic dividers with tabs.
Cable Installation
[Six] [_____] copies of the information described below in 215.9
by 279.4 mm (8-1/2 by 11 inch) 8-1/2 by 11 inch binders having a
minimum of three rings from which material may readily be removed
and replaced, including a separate section for each cable pull.
Sections shall be separated by heavy plastic dividers with tabs,
with all data sheets signed and dated by the person supervising
the pull.
a.
Site layout drawing with
cable pulls numerically identified.
b. A list of equipment used, with calibration certifications.
The manufacturer and quantity of lubricant used on pull.
c.
The cable manufacturer and type of cable.
d. The dates of cable pulls, time of day, and ambient
temperature.
e. The length of cable pull and calculated cable pulling
tensions.
f.
The actual cable pulling tensions encountered during pull.
SD-07 Certificates
Material and Equipment
Where materials or equipment are specified to conform to the
standards of the Underwriters Laboratories (UL) or to be
constructed or tested, or both, in accordance with the standards
of the American National Standards Institute (ANSI), the Institute
of Electrical and Electronics Engineers (IEEE), or the National
Electrical Manufacturers Association (NEMA), the Contractor shall
submit proof that the items provided conform to such requirements.
The label of, or listing by, UL will be acceptable as evidence
that the items conform. Either a certification or a published
catalog specification data statement, to the effect that the item
is in accordance with the referenced ANSI or IEEE standard, will
be acceptable as evidence that the item conforms. A similar
certification or published catalog specification data statement to
the effect that the item is in accordance with the referenced NEMA
standard, by a company listed as a member company of NEMA, will be
acceptable as evidence that the item conforms. In lieu of such
certification or published data, the Contractor may submit a
certificate from a recognized testing agency equipped and
competent to perform such services, stating that the items have
been tested and that they conform to the requirements listed,
including methods of testing of the specified agencies.
Compliance with above-named requirements does not relieve the
Contractor from compliance with any other requirements of the
specifications.
Cable Joints
SECTION 16375A
Page 14