surveillance.
b.
Submit remaining substation component submittals to Engineer of Record
for approval. In addition, submit one set of transformer submittals
for surveillance and to insure alignment of equipment and coordination
SD-02 Shop Drawings
Unit substation drawings; G
[
SD-03 Product Data
**************************************************************************
NOTE: Use bracketed options referring to Codes CI44
and 074 for LANTNAVFACENGCOM and SOUTHNAVFACENGCOM
projects, respectively. This requires the designer
of record to review and approve the substation
equipment submittals except for the transformer.
The EFD will review and approve the transformer
submittals.
**************************************************************************
Primary unit substations[ excluding transformer data]; G
[
Unit substation transformer[ (to Code [CI44][074])]; G]
Submittal shall include manufacturer's information for each
component, device and accessory provided with the equipment.
SD-05 Design Data
Capacity calculations for battery charger and batteries
G
SD-06 Test Reports
**************************************************************************
SOUTHNAVFACENGCOM projects.
**************************************************************************
Submit report of results of acceptance checks and tests specified
by paragraph entitled "Field Quality Control"; G
**************************************************************************
NOTE: Field dielectric tests are recommended only
when new units added to an existing installation or
after major field modifications. If necessary,
service the equipment prior to the field test.
**************************************************************************
[
Certified copies of dielectric tests report; G]
SD-07 Certificates
SECTION 16361N
Page 10