request for settings" for SOUTHNAVFACENGCOM projects.
**************************************************************************
[
[
Formal request for settings; G]
Equipment test schedule[ (to Code [CI44][074])]; G
1.4
QUALITY ASSURANCE
1.4.1
Battery Power Calculations
Submit capacity calculations for battery charger and batteries.
Calculation shall verify that battery capacity exceeds station d.c. power
requirements.
[1.4.2
Transformer Losses
**************************************************************************
NOTE: Use this paragraph for LANTNAVFACENGCOM
projects only.
**************************************************************************
Submit certification from the manufacturer indicating conformance with the
paragraph entitled "Specified Transformer Losses".
]1.4.3
Unit Substation Drawings
Drawings shall include, but are not limited to the following:
a.
An outline drawing with front, top, and side views
b.
Ampere ratings of bus bars
c.
Maximum short-circuit bracing
d.
Nameplate data
[e.
Provisions for future extension[ and future forced air equipment]]
[f.
devices including available settings]
g.
interconnection between the items
h.
transformers, meters,] and fuses
i.
Manufacturer's instruction manuals and published time-current curves
(on full size 11 x 17 inches 279 x 431 mm logarithmic paper) of the[
fuse in the load interrupter switch,][ main secondary breaker,][
largest secondary feeder device]; transformer thermal and magnetic
damage information; and transformer inrush current information
(magnetic inrush point). These shall be used by the designer of record
to verify fuse size and to[ provide breaker settings that will] ensure
protection and coordination are achieved.