][1.4.7
**************************************************************************
NOTE: Include this paragraph for SOUTHNAVFACENGCOM
projects.
**************************************************************************
Submit test results on protective relays via the Contracting Officer to
SOUTHNAVFACENGCOM; Code 162; Director, Utilities Engineering Division.
Submit operation and maintenance data in accordance with Section 01781
OPERATION AND MAINTENANCE DATA.
]1.5
MAINTENANCE
1.5.1
Additions to Operation and Maintenance Data
In addition to requirements of Data Package 5, include the following on the
actual primary unit substations provided.
a.
An instruction manual with pertinent items and information highlighted
b.
An outline drawing, including front view and sectional views with items
and devices identified
c.
Prices for spare parts and supply list
d.
Routine and field acceptance test reports
e.
[f.
Information on metering]
g.
Actual nameplate diagram
h.
Date of purchase
PART 2
PRODUCTS
2.1
PRODUCT COORDINATION
**************************************************************************
NOTE: For LANTNAVFACENGCOM projects, change Section
16302N, "Underground Transmission and Distribution"
to Section 16303N, "Underground Electrical Work"
(typical throughout this specification).
**************************************************************************
Products and materials not considered to be secondary unit substations and
related accessories are specified in Section 16302N UNDERGROUND
TRANSMISSION AND DISTRIBUTION, and Section 16402 INTERIOR DISTRIBUTION
SYSTEM.
2.2
PRIMARY UNIT SUBSTATIONS
NEMA C37.121, [single-ended][double-ended] arrangement, consisting of
[one][two] incoming sections, [one][two] transformer sections, [one][two]
transition sections, the number of auxiliary sections, bus-tie sections,
SECTION 16361N
Page 14