i.
[_____]
1.2.4
Incoming and Outgoing Circuit Compliance
[Aerial line circuits shall comply with the requirements of Section 16370A
ELECTRICAL DISTRIBUTION SYSTEM, AERIAL.] [Underground circuits shall
comply with the requirements of Section 16375A ELECTRICAL DISTRIBUTION
SYSTEM, UNDERGROUND.] [Circuits in cable trays shall comply with the
requirements of Section 16375A ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
for cable and with the requirements of Section 16402 INTERIOR DISTRIBUTION
SYSTEM for cable trays.]
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
General Installation Requirements
SECTION 16311A
Page 13