SD-09 Manufacturer's Field Reports
**************************************************************************
NOTE:
Delete "Medium voltage cable tests" for
SOUTHNAVFACENGCOM projects. For LANTNAVFACENGCOM
projects, include this submittal items under SD-06
Test Reports
**************************************************************************
Arc-proofing test for cable fireproofing tape; G
Medium voltage cable tests; G
**************************************************************************
NOTE: Delete heat shrinkable joint test for
LANTNAVFACENGCOM projects.
**************************************************************************
Factory engineered heat shrinkable joint kit
1.5
QUALITY ASSURANCE
**************************************************************************
NOTE: Delete the text of this paragraph for
LANTNAVFACENGCOM projects.
**************************************************************************
**************************************************************************
NOTE: In situations requiring work in confined
spaces, provide names of "competent persons";
"competent person" means one who is capable of
identifying and testing existing and potential
to take prompt action to eliminate hazards. Also,
if work to be performed is covered by FAR clauses,
the Contractor shall be required to prepare and
submit a written confined space entry procedure per
EM 385-1-1.
**************************************************************************
Each cable splicer may be required to make an approved dummy splice in the
presence of the Contracting Officer in accordance with cable manufacturer's
instructions. The Contractor shall furnish the material for dummy splices.
1.5.1
Cable Splicer Qualifications
a.
In order to establish the cable workman's competency, the
Contractor shall be required to submit the following within 30
calendar days prior to commencement of the splice/termination:
(1) Documentation to verify that the individual has completed a
splice/termination of the type to be installed under this
contract. The test splice-termination shall be performed at the
job site for this contract under the supervision of the cable
accessory manufacturer or his representative and witnessed by the
Government.
(2)
Documentation that said splice/termination has undergone and
SECTION 16302N
Page 10