APPENDIX A
For [_____] Piping System
Checklist Item
Q
M
E
T
C
D
O
U
Installation
a.
Piping complete.
___ ___
X
___
X
___ ___ ___
b.
As-built shop drawings submitted.
___ ___
X
___
X
___ ___ ___
c.
Piping flushed and cleaned.
___ ___
X
___
X
___ ___ ___
d.
Strainers cleaned.
___ ___
X
___
X
___ ___ ___
e.
Valves installed as required.
___ ___
X
___
X
___ ___ ___
f.
Piping insulated as required.
___ ___
X
___
X
___ ___ ___
g.
Thermometers and gauges installed as
required.
___ ___
X
___
X
___ ___ ___
h.
Verify operation of valves.
___ ___
X
___ ___ ___ ___ ___
i.
Air vents installed as specified.
___ ___
X
X
X
___ ___ ___
j.
Flexible connectors installed as specified__ ___
X
X
X
___ ___ ___
k.
Verify that piping has been labeled and
valves identified as specified.
___ ___
X
___ ___ ___ ___ ___
Testing, Adjusting, and Balancing (TAB)
a.
___ ___
X
___
X
___ ___ ___
b.
TAB operation complete.
___ ___
X
___ ___ ___ ___ ___
SECTION 15995A