all offsets, fittings, and accessories that may be required. The
Contractor shall carefully investigate the mechanical, electrical, and
finish conditions that could affect the work, and shall furnish all work
necessary to meet such conditions.
1.8.4.1
List of Drawings
Provide a list of drawings.
1.8.4.2
List of Symbols and Abbreviations Used on Drawings
Provide an index of symbols and abbreviations used on the drawings.
1.8.4.3
List of I/O Points
For each input and output physically connected to a digital controller
provide, on a controller by controller basis, provide the following:
a.
Point description:
for example: mixed air temperature, supply fan
start/stop, etc.
b.
Point type:
AO, AI, DO, or DI.
c.
Point range
d.
Sensor range associated with point range:
e.
Software name(s) associated with point, if any.
f.
Point connection terminal number
1.8.4.4
Equipment Components List
Submit a listing of controllers and connected devices shown on control
system schematic. List the following:
a.
b.
Description
c.
Manufacturer of controller
d.
Controller's name
e.
Equipment part numbers
f.
Cv for valves
g.
For actuators:
(1)
Motive force (such as pneumatic, or electric)
(2)
Normal position
(3)
Nominal operating range (such as 3 to 7 psi, 4 to 8 mA)
1.8.4.5
AC Power Table
SECTION 15910N
Page 22