projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Drawings; G
List of Symbols and Abbreviations Used on Drawings; G
List of I/O Points; G
Equipment Components List; G
AC Power Table; G
SD-02 Shop Drawings
Ladder diagrams; G
Terminal strip diagrams; G
Communication architecture schematic; G
SD-03 Product Data
DDC hardware; G
DDC capabilities; G
Workstation software; G
Surge and Transient Protection; G
Notebook computer; G
Hand-Held terminal; G
Pneumatic tubing; G